Vacant Property Security Guides and Checklists
Use concise, field-ready resources to prepare a property, collect the right information, coordinate authorized access and document the next milestone.




What Stage Is the Property At?
Each stage has its own field list. Work through it on site, then bring the completed answers into a Site Recommendation.
- Before Assessment
- Before Installation
- During the Rental
- Authorized Re-entry
- Before Removal
- Local Requirements
Stage 01
Before the Assessment
What to establish before anyone travels to the property, so the visit is worth making.
8 items
Record On Site
- Complete property address and responsible jurisdiction
- Vacancy or occupancy status, confirmed by someone who has seen it
- Property type and approximate age
- Named local contact who can reach the site
- Safe crew access — driveway, gate, alley, steps
- Current hazards visible from outside
- Photographs of each elevation you can reach safely
- Any current notice or order attached to the address
Why It Matters
Most delayed requests fail here, not later. A crew that arrives to an occupied, gated or unreachable property loses the visit entirely.
Take It Further
Stage 02
Before Installation
The measurements and decisions that determine what is actually fitted.
7 items
Record On Site
- Door and window count per elevation
- Opening dimensions, including anything irregular or altered
- Existing boarding and its condition
- Below-grade and rear openings, counted separately
- Exposed equipment — condensers, meters, mechanical units
- Staging space for equipment and vehicles
- Who holds authority to approve the work
Why It Matters
Opening counts taken from the front elevation alone get re-scoped on site. Rear and below-grade openings are usually the ones that decide the job.
Take It Further
Stage 03
During the Rental
Keeping the property record accurate while the steel is in place.
6 items
Record On Site
- Current responsible party and local contact
- Installed equipment recorded against the address
- Authorized user roster, kept short and current
- Property condition changes since installation
- Any new notice or correspondence received
- Expected duration and next review date
Why It Matters
Records drift. When a contractor, asset manager or owner changes, an out-of-date roster is what stalls the next visit.
Take It Further
Stage 04
Authorized Re-entry
Getting the right people back inside without reopening the building to everyone.
6 items
Record On Site
- Who needs entry, and for what task
- Which access method applies at this property
- How the method is issued and recorded
- Who approves adding or removing a user
- What happens when a vendor or owner changes
- Where the access record is kept
Why It Matters
One controlled route keeps the roster short. Credentials passed along informally are the most common way access control quietly fails.
Take It Further
Stage 05
Before Service or Removal
Planning the end of the job before the milestone arrives.
6 items
Record On Site
- The milestone that ends or changes the scope
- Confirmed date, not an assumed one
- Party authorised to approve removal
- Which openings release first, if phased
- Site access for the removal crew
- Final condition documentation required
Why It Matters
Removal planned at the start is scheduled work. Removal discovered at the last minute competes with everything else in the market that week.
Take It Further
Stage 06
Local-Requirement Research
Establishing what the responsible authority actually requires for this address.
6 items
Record On Site
- Responsible municipality or county — not the mailing city
- Current registration or vacant-property requirement
- Any notice or order attached to the property
- Inspection or maintenance obligations
- Who at the organisation owns compliance
- Date the requirement was last verified
Why It Matters
A market label answers nothing. Requirements differ street to street across a metro, and an old letter is not the current rule.
Take It Further
Using a Checklist ResponsiblyA checklist records what you can see and confirm. It does not assess structure, verify a local requirement or approve a scope — DAWGS reviews the property itself before any recommendation is made.
Bring the Completed Field List to a Site Recommendation.
Address, vacancy status, openings, access, condition and timing — the same information the checklists collect is exactly what the review needs.
Move From Research to a Property-Specific Answer
DAWGS can confirm coverage and recommend a scope after reviewing the property address, vacancy, openings, condition, access and expected duration. Use the site-recommendation form for planned work or call 1-877-883-2947 when an open property needs urgent review.

