Field Kit Library

Vacant Property Security Guides and Checklists

Use concise, field-ready resources to prepare a property, collect the right information, coordinate authorized access and document the next milestone.

Side approach and openings of a property being assessed in the field
Before assessment · what to record
Steel window panel fitted to a masonry opening
Openings
Installed steel door guard with controlled entry
Access
Equipment staged in the warehouse bay
Removal
Choose the Property Stage

What Stage Is the Property At?

Each stage has its own field list. Work through it on site, then bring the completed answers into a Site Recommendation.

Stage 01

Before the Assessment

What to establish before anyone travels to the property, so the visit is worth making.

8 items

Record On Site

  • Complete property address and responsible jurisdiction
  • Vacancy or occupancy status, confirmed by someone who has seen it
  • Property type and approximate age
  • Named local contact who can reach the site
  • Safe crew access — driveway, gate, alley, steps
  • Current hazards visible from outside
  • Photographs of each elevation you can reach safely
  • Any current notice or order attached to the address

Why It Matters

Most delayed requests fail here, not later. A crew that arrives to an occupied, gated or unreachable property loses the visit entirely.

Take It Further

Stage 02

Before Installation

The measurements and decisions that determine what is actually fitted.

7 items

Record On Site

  • Door and window count per elevation
  • Opening dimensions, including anything irregular or altered
  • Existing boarding and its condition
  • Below-grade and rear openings, counted separately
  • Exposed equipment — condensers, meters, mechanical units
  • Staging space for equipment and vehicles
  • Who holds authority to approve the work

Why It Matters

Opening counts taken from the front elevation alone get re-scoped on site. Rear and below-grade openings are usually the ones that decide the job.

Take It Further

Stage 03

During the Rental

Keeping the property record accurate while the steel is in place.

6 items

Record On Site

  • Current responsible party and local contact
  • Installed equipment recorded against the address
  • Authorized user roster, kept short and current
  • Property condition changes since installation
  • Any new notice or correspondence received
  • Expected duration and next review date

Why It Matters

Records drift. When a contractor, asset manager or owner changes, an out-of-date roster is what stalls the next visit.

Take It Further

Stage 04

Authorized Re-entry

Getting the right people back inside without reopening the building to everyone.

6 items

Record On Site

  • Who needs entry, and for what task
  • Which access method applies at this property
  • How the method is issued and recorded
  • Who approves adding or removing a user
  • What happens when a vendor or owner changes
  • Where the access record is kept

Why It Matters

One controlled route keeps the roster short. Credentials passed along informally are the most common way access control quietly fails.

Take It Further

Stage 05

Before Service or Removal

Planning the end of the job before the milestone arrives.

6 items

Record On Site

  • The milestone that ends or changes the scope
  • Confirmed date, not an assumed one
  • Party authorised to approve removal
  • Which openings release first, if phased
  • Site access for the removal crew
  • Final condition documentation required

Why It Matters

Removal planned at the start is scheduled work. Removal discovered at the last minute competes with everything else in the market that week.

Take It Further

Stage 06

Local-Requirement Research

Establishing what the responsible authority actually requires for this address.

6 items

Record On Site

  • Responsible municipality or county — not the mailing city
  • Current registration or vacant-property requirement
  • Any notice or order attached to the property
  • Inspection or maintenance obligations
  • Who at the organisation owns compliance
  • Date the requirement was last verified

Why It Matters

A market label answers nothing. Requirements differ street to street across a metro, and an old letter is not the current rule.

Take It Further

Using a Checklist ResponsiblyA checklist records what you can see and confirm. It does not assess structure, verify a local requirement or approve a scope — DAWGS reviews the property itself before any recommendation is made.

Ready to Use It

Bring the Completed Field List to a Site Recommendation.

Address, vacancy status, openings, access, condition and timing — the same information the checklists collect is exactly what the review needs.

Take the Next Step

Move From Research to a Property-Specific Answer

DAWGS can confirm coverage and recommend a scope after reviewing the property address, vacancy, openings, condition, access and expected duration. Use the site-recommendation form for planned work or call 1-877-883-2947 when an open property needs urgent review.